Runway Park
Runway Park is the University of Sheffield’s Innovation District at the former Sheffield City Airport. We are progressing plans for the next phase of the site so it can continue to support research, innovation and high-value employment in South Yorkshire.
Latest update
November 2026 - Planning application submitted
The University has submitted an outline planning application for the next phase of Runway Park (Phase 2). The application seeks to establish the overall principles and current maximum scale of development, alongside detailed approval for parts of the site’s access arrangements.
The application does not approve or commit the University to constructing all the buildings shown in the illustrative masterplan. Individual plots would be developed in phases as requirements and commercial opportunities arise, with further detailed applications required.
[Add link to the Sheffield City Council planning application.]
About Runway Park
Runway Park brings together the University’s already established facilities delivered within Phase 1, including AMRC Factory 2050, COMPASS (Composites at Speed and Scale) and the Energy Innovation Centre, and the future development opportunities at the former airport site. The first phase is already established and includes University research and innovation activity. Currently the project is focused on creating a clear planning framework for the next phase of development.
The site sits within South Yorkshire’s Advanced Manufacturing Innovation District and adjacent to the Advanced Manufacturing Park, home to the University’s Advanced Manufacturing Research Centre (AMRC). Its long-term purpose is to build on the University’s strengths in translating research into practical industrial solutions, particularly in advanced manufacturing, clean energy, aerospace and defence.
The plans also support the University’s aim to attract investment, provide opportunities for growth in the already established innovation ecosystem, and contribute to skilled jobs and regional growth.
What planning permission is being sought
The proposed hybrid application relates to the former runway and adjoining development land rather than the whole Runway Park site.
The application asks for:
- outline permission for up to 86,150 m² of development
- agreement to the maximum scale and key parameters of development
- detailed approval for the first 10 metres of the eastern and western access routes
- a landscape-led framework for movement, drainage, public realm and green infrastructure
- flexibility for individual plots to respond to the needs of future occupiers.
The illustrative masterplan shows one way the site could be developed. It is used to test capacity, infrastructure and environmental requirements, but it does not fix the final number, size or arrangement of buildings.
A phased development
Runway Park will not be built out as a single construction project. Subject to planning permission, development would take place over time and individual plots would come forward when there is a confirmed requirement.
Further reserved matters or detailed planning applications would be required before individual buildings could be constructed. These would provide more information about matters such as appearance, layout, landscaping and access, and would be considered through the normal planning process.
Landscape, drainage and sustainability
The masterplan is led by the site’s existing landscape and drainage features. The southern swale - a shallow channel that manages surface water - would form the basis of a connected blue-green corridor through the site.
The emerging proposals include:
- sustainable drainage and surface water management features
- biodiversity improvements
- walking and cycling routes through the landscaped corridor
- public realm and amenity space
- use of recycled and locally sourced materials where appropriate
- development principles aligned with the UK Net Zero Carbon Buildings Standard.
As part of its wider decarbonisation plans and net-zero targets, the University is also exploring opportunities for on-site renewable energy generation and shared low-carbon energy infrastructure. These elements will be developed further as the plans progress and individual plots come forward.
Access and transport
The planning application will establish how the development connects to the existing road network, with access from both the eastern and western ends of the former runway. Most vehicle movements and servicing would be concentrated towards the north of the site, helping to protect the landscaped corridor to the south.
Transport assessments will consider predicted journeys and parking demand. The framework will also seek to improve walking and cycling connections and allow the site to respond to future improvements in public transport.
What happens next
Sheffield City Council will consult on the planning application. The Council will then assess the proposals and the supporting technical information before making a decision.
If outline permission is granted, this would establish the broad development framework. It would not mean construction across the site would begin immediately. The University would continue to develop individual proposals and submit the further approvals required for each phase.
We will update this page as the planning application progresses and when there is practical information to share about any future work on site.
Further information
For information about opportunities to locate, collaborate or invest at Runway Park, visit the Runway Park website.
For questions about the University’s planning and development project, contact campusdevelopment@sheffield.ac.uk.