Current Work Item,0
DRB,0.035
DRBi,0.0344
DRC,0.035
DRCi,0.0344
Graph Sync Interval,5
Hip Fracture Cost,7000
Intervention,1
InterventionCost,500
Large Number,1000000
MortPropHip,0.05
NumPats,50000
Overhead Cost,0
Overhead Revenue,0
Results Collection Period,10
Simulation Time,10
Temp,10.86852
Total Cost,8777.40917
Total DCost,6879.27113
Total DQALYs,6.62791
Total QALYs,8.13658
Utility Multiplier Hip,0.75
Utility Multiplier Vert,0.9
Vert Fracture Cost,3000
Warm Up Period,0
